Nagpur

Nagpur Flyovers Expose Drainage Flaws During Monsoon


Advertisement

Nagpur: Flyovers built at a cost of crores to ease traffic congestion in Nagpur are now turning into a major inconvenience during the monsoon. From the newly constructed Indora–Dighori Flyover to the Shaheed Gowari Flyover on Wardha Road, rainwater is reportedly pouring directly onto motorists and pedestrians below, raising concerns over construction quality and incomplete drainage infrastructure.

As soon as it rains, water accumulated on the flyovers gushes through drainage openings and falls onto the roads beneath like a waterfall. The sudden flow of water has startled two-wheeler riders and motorists, increasing the risk of accidents and making travel hazardous.

Gold Rate
July 30 ,2026 – Time 10.30Hrs

Gold 24 KT
₹ 1 43,100 /-

Gold 22 KT
₹ 1,32,800 /-

Silver/Kg
₹ 2,18,100/-

Platinum
₹ 88,000/-

Recommended rate for Nagpur sarafa Making charges minimum 13% and above

Incomplete Drainage System Raises Questions

At the Indora–Dighori Flyover, drainage holes have been provided to channel rainwater, but the pipes required to carry the water safely to the ground are yet to be installed. As a result, rainwater falls directly from the flyover onto the road below.

Advertisement

The stretch between Lal Imli Chowk and Golibar Chowk has become a major trouble spot, where commuters are forced to navigate through continuous streams of water falling from above during every spell of rain.

Similar Problem at Shaheed Gowari Flyover

The issue is not limited to the Indora–Dighori Flyover. At the Shaheed Gowari Flyover on Wardha Road, between Panchsheel Chowk and Mor Bhavan Chowk, rainwater also drains directly onto the road below due to missing or damaged drainage pipes.

Residents and daily commuters say the situation has become a recurring problem every monsoon, creating inconvenience as well as safety hazards.

Agencies Respond

The construction agency executing the Indora–Dighori Flyover, NCC, has stated that the project is still under construction and that drainage pipes will be installed shortly, after which the issue is expected to be resolved.

Regarding the Shaheed Gowari Flyover, officials from the National Highways Authority of India (NHAI) said drainage pipes had been installed earlier, but maintenance within city limits falls under the responsibility of the local civic authorities, who are expected to carry out necessary repairs.

Safety Concerns Mount

Experts point out that an efficient drainage system is a critical component of any flyover. Improper rainwater disposal can lead to waterlogging, slippery road conditions, reduced visibility, and a higher risk of accidents for both motorists and pedestrians.

Citizens Demand Immediate Action

Residents have urged the authorities not to wait until the end of the monsoon to address the issue. They have called for the immediate installation and repair of drainage systems on all affected flyovers to ensure public safety and prevent accidents.

The recurring problem has sparked concerns that infrastructure built to improve urban mobility could become a safety hazard if essential drainage works are not completed and maintained on time.

Advertisement

GET YOUR OWN WEBSITE

FOR ₹9,999

Domain & Hosting FREE for 1 Year

No Hidden Charges

Please follow and like us:
error20
fb-share-icon584226
Tweet 20
fb-share-icon20

Leave a Reply

Your email address will not be published. Required fields are marked *

error

Enjoy this blog? Please spread the word :)